Every question about your product has an answer in the system
Syntech Manufacturing is an MES/MRP application on Creatio: demand and plan, shop floor and warehouse, quality, contracts and shipment in one database. The defence contour — state contracts, military acceptance, NATO codification, export licences — sits inside the product, in your perimeter, in three languages.
- 47sections
- the whole plant in one application, every section with a web page and a mobile page.
- 25of 29 requirements
- the defence matrix: 25 met, 2 partial, 2 not met, and we name which ones.
- 7mobile role workplaces
- shop floor, warehouse, quality, maintenance, production management, personnel, reference data.
The questions are simple. The answers take weeks
Questions about production are asked every day, and all of them sound ordinary. The answer usually lives with one person rather than in a system, and only while that person is there.
Which order is late?
the plan is in a spreadsheet, the fact is in the supervisor's head, and the date was promised two days ago without checking material or capacity.
What is inside serial number 0431?
the unit was built and shipped, and the component batches with their certificates have to be reconstructed from delivery notes and memory.
Under which revision was it built?
engineering released a change, the routing map at the workstation stayed old, and nobody can say which unit the new revision started with.
Which licence covers this shipment?
the licence exists, the remaining quantity lives in a separate file, and the end user was last screened six months ago.
These questions are not asked out of curiosity. They come from the customer, the military representative, a licence audit and your own finance director. Assembled by hand, an answer costs a week in the archive and still stays approximate — and approximate is easy to spot.
One system, not an integration
sales, contracts, production, warehouse, quality and cost sit in one Creatio database. No connector between CRM and MES, no nightly sync, no second item master. A production order knows its contract; a serial knows its acceptance act.
The defence contour is in the product
state contracts with a delivery schedule and advances, military acceptance acts, NATO codification (NSN, NIIN, NCAGE), export licences with end-user screening, staff reservation, traceability and recall. Standard sections, not a one-off customisation.
Traceability that answers in minutes
scan a serial number and see the BOM revision, the component batches, the supplier certificates, the operations and operators, the inspections, the acceptance act and the shipment. Everything affected is held or recalled in one action, and the customer notification list exports to Excel.
You can change it yourself
Creatio low-code: fields, processes, pages, rights and reports are your administrators' work, not ours. Deploy on-premise or in a private cloud, run three languages, and open all 47 sections on a phone.
Thirteen areas, one application
Planning and MRP
the production plan, requirements exploded through the bills of materials, production orders and purchase requests in one action.
Order queue and promised dates
one ranked queue of sales orders, contract deliveries and unit requests, with ATP/CTP dates and their reason chain.
Engineering
bills of materials and routings under revision control, change notices, CAD/PDM import, NATO codification.
Shop floor
the operator workstation, shift assignments, andon signals, the work centre monitor, OEE.
Equipment and metrology
equipment passports, preventive maintenance, repair orders from andon, measuring instruments under calibration control.
People
the qualification matrix checked when an operation starts, staff reservation, time tracking, piece-rate pay.
Quality
incoming, in-process and final inspection, non-conformances, CAPA, 8D, printed test protocols.
Traceability and recalls
search by batch or serial in both directions, quality holds, recalls, the electronic product dossier.
Contracts and military acceptance
the state contract with its delivery schedule and advances, acceptance acts, the archive of acceptance documents.
Export control
licences with quantity and value usage, end-user screening, end-use certificates, the check before a shipment leaves.
Warehouse and bins
bin storage, batches and serials, FEFO/FIFO, issue documents, transfers, labels.
Procurement and receiving
purchase requests from MRP, approvals, receiving with incoming inspection and supplier certificates.
Administration and mobile
settings, roles and approvers, background jobs, the manufacturing log, seven mobile workplaces.
Who uses it every day
The production director
the order queue with promised dates, late orders and operations on the home page, shift assignments, the real shift fact instead of a Friday summary.
The chief engineer and technologist
bills of materials and routings under revision control, change notices with approval, technological maps at the workstation, NATO codes on the product card.
The quality and compliance lead
acceptance criteria inside the routing, non-conformances raised automatically, CAPA and 8D, traceability both ways, acts and the electronic dossier.
The IT lead
one Creatio database instead of three systems and the traffic between them, standard roles, rights and audit logs, your own perimeter, changes without calling the vendor.
How much of the defence requirement set we really cover
We scored the product against the Ukrainian defence-manufacturing requirement matrix: 29 business requirements, judged strictly — "met" means the whole requirement can be completed in the product today. The result is 25 met, 2 partial, 2 not met. There is no register of state-secret clearances and no catalogue sync with DOT-Chain Defence; the evidence pack for a licence audit and product configuration management are partial.
See it on an order of your own
Half an hour on your own scenario: one order from plan to shipment, one serial number from the supplier certificate to the acceptance act. We will also show what it does not do.
Як це виглядає в системі
Реальні екрани Syntech Manufacturing на платформі Creatio: планування, склад, якість, зміни, OEE, Andon і маркування.

Виробниче планування
Діаграма Ганта за робочими центрами з залежностями, статусами, завантаженням і деталями кожної операції.

Історія руху запасів
Повний журнал приймання, видачі та внутрішніх переміщень із партією, кількістю, комірками, документом і відповідальним.

Контроль якості
Фінальна інспекція за критеріями: допустимі межі, фактичні значення, статуси вимірювань, коментарі та підсумковий результат.

Календар змін
Планування персоналу за робочими центрами: зміни, вихідні, відрядження та контроль покриття потрібної кількості працівників.

OEE та First Pass Yield
Доступність, продуктивність, якість, OEE і FPY по робочих центрах із порівнянням з цільовими показниками.

Andon-сигнал з робочого місця
Оператор повідомляє про нестачу матеріалів, проблему якості, поломку, інструмент або небезпеку безпосередньо з операції.

Маркування серійного виробу
Друк етикетки DataMatrix для серійного номера з шаблоном, попереднім переглядом та історією друку.

Маркування партії
Етикетка партії з кодом, кількістю, датою виготовлення, терміном придатності та штрихкодом Code 128.

Коміркове зберігання
Пошук складських комірок за зоною, товаром, партією або серійним номером із відображенням місткості та статусу.

Карта складських комірок
Візуальна карта зон і проходів зі статусами вільних, частково зайнятих, зайнятих та заблокованих комірок.

Налаштування Andon
Налаштування ролей сповіщення, строків ескалації та автоматичної зупинки операції після Andon-сигналу.

Конструктор шаблонів етикеток
Візуальне створення етикеток для партій і серійних виробів із плейсхолдерами, штрихкодами та попереднім переглядом.
Подивіться систему в дії
Детальний огляд можливостей Syntech Manufacturing на платформі Creatio