Every question about your product has an answer in the system
Syntech Manufacturing is an MES/MRP application on Creatio. Demand and plan, procurement, shop floor and warehouse, quality, contracts and shipment run in one database, and analytics shows where margin is lost and why deliveries slip. The defence contour is part of the product: state contracts, military acceptance, NATO codification and export licences. It runs in your perimeter, in three languages.
- 61sections
- the whole plant in one application; 51 sections also have mobile pages.
- 27of 29 requirements
- the defence matrix: 27 met, 2 not met, and we name which ones.
- 7mobile role workplaces
- shop floor, warehouse, quality, maintenance, production management, personnel, reference data.
The questions are simple. The answers take weeks
Questions about production are asked every day, and all of them sound ordinary. The answer usually lives with one person rather than in a system, and only while that person is there.
Which order is late?
the plan is in a spreadsheet, the fact is in the supervisor's head, and the date was promised two days ago without checking material or capacity.
What is inside serial number 0431?
the unit was built and shipped, and the component batches with their certificates have to be reconstructed from delivery notes and memory.
Under which revision was it built?
engineering released a change, the routing map at the workstation stayed old, and nobody can say which unit the new revision started with.
Which licence covers this shipment?
the licence exists, the remaining quantity lives in a separate file, and the end user was last screened six months ago.
Where did we lose margin?
cost is calculated at month end from average prices, and nobody can split the gap between planned and actual margin into materials, labour, downtime and scrap.
These questions are not asked out of curiosity. They come from the customer, the military representative, a licence audit and your own finance director. Assembled by hand, an answer costs a week in the archive and still stays approximate. And approximate is easy to spot.
One system, not an integration
sales, procurement, contracts, production, warehouse, quality and cost sit in one Creatio database. There is no connector between CRM and MES, no nightly sync and no second item master. The path from an approved purchase request to receiving, the bin, the operation, the quality check and the shipment needs no re-keying.
The defence contour is in the product
state contracts with a delivery schedule and advances. Military acceptance acts with shipment control. NATO codification (NSN, NIIN, NCAGE) and export licences with end-user screening. Staff reservation, traceability and recall. There is also an evidence pack for licence audits. These are standard sections, not a one-off customisation.
Traceability that answers in minutes
scan a serial number and see the BOM revision, the component batches, the supplier certificates, the operations and operators, the inspections, the acceptance act and the shipment. Everything affected is held or recalled in one action, and the customer notification list exports to Excel.
Numbers your finance director can trust
materials are valued at the cost of the batches actually picked. Labour is actual time multiplied by the worker's rate. Standard cost is frozen when the order is released. That lets analytics break the gap between planned and actual margin into materials, labour, machine time, overhead and the cost of non-conformances, for every order, product, customer and contract.
You can change it yourself
Creatio low-code: fields, processes, pages, rights and reports are your administrators' work, not ours. More than 125 manufacturing settings sit on one screen. Most new features ship switched off or in warning mode, so each plant turns them on when it is ready. Deploy on-premise or in a private cloud, in three languages.
Fourteen areas, one application
Planning and MRP
the production plan, multi-level MRP netting through bills of materials, sales-order split into batches, scenarios and growth forecast, with production orders and purchase requests in one action.
Order queue and promised dates
a live queue of sales orders, contract deliveries and unit requests. The ATP/CTP date is set as soon as an order is confirmed, after a material check across all open orders.
Engineering
bills of materials, recipes and routings under revision control, change notices, approved substitutes and variants, CAD/PDM and Excel import, norm times from actual runs, NATO codification.
Shop floor
automatic shift assignments, a full-screen operator workspace, a kiosk with badge or PIN, andon with escalation, WIP limits, OEE, and a digital floor with a live view of each area.
Equipment and metrology
equipment passports, MTBF/MTTR, preventive maintenance, repair orders from andon, measuring instruments under calibration control, an equipment check at operation start.
People
the qualification matrix checked when an operation starts, military registration and staff reservation with quota control, time tracking, piece-rate pay.
Quality
inspection criteria in the routing, automatic inspection when an operation ends, non-conformances, 8D and CAPA, test protocols, certificates of analysis per batch or shipment.
Traceability and recalls
search by batch or serial in both directions, holds, recalls, the unit passport, an as-designed vs as-built comparison.
Contracts and military acceptance
the state contract with stages, delivery schedule and advances, a traffic-light delivery board, acceptance acts with shipment control.
Export control
licences with quantity and value usage, party screening, end-use certificates, a block or warning at shipment, an evidence pack for licence audits.
Warehouse and bins
bin storage with putaway rules, FEFO/FIFO/LIFO issues, warehouse orders, stocktake with scanning, a label print centre.
Procurement and receiving
purchase requests from MRP, approvals with amount thresholds, receiving against the request line with scanning, three-way matching of supplier invoices.
Production analytics
planned vs actual margin with a cause breakdown, on-time production, customer shipments and contract deliveries with delay causes, plan attainment, OEE and scrap.
Administration and mobile
manufacturing settings in one place, 15 functional roles with role workplaces, two-person rules, background jobs, seven mobile workplaces.
Who uses it every day
The production director
the order queue with promised dates, shift assignments drafted in the evening and approved in the morning, the shift fact in one entry, and a digital floor showing every work centre, open andons and the people on shift.
The chief engineer and technologist
bills of materials and routings under revision control, change notices with approval, technological maps at the workstation, NATO codes on the product card.
The quality and compliance lead
acceptance criteria inside the routing, non-conformances raised automatically, CAPA and 8D, traceability both ways, acts and the electronic dossier.
The finance director
margin for every order, product, customer and contract with the variance broken down. Purchase approvals by amount threshold. Three-way matching of ordered, received and invoiced quantities on supplier invoices. Financial data is visible only to roles with financial access.
The IT lead
one Creatio database instead of three systems and the traffic between them. Standard roles, rights, two-person rules and audit logs. Your own perimeter. New features switch on by setting, and changes are made without calling the vendor.
How much of the defence requirement set we really cover
We scored the product against the Ukrainian defence-manufacturing requirement matrix: 29 business requirements, judged strictly. "Met" means the whole requirement can be completed in the product today. The result is 27 met and 2 not met. In autumn 2026 the evidence pack for licence audits and product configuration management, with variants and an as-designed vs as-built comparison, moved those two rows from partial to met. There is still no register of state-secret clearances and no catalogue sync with DOT-Chain Defence.
Tested before it reaches you
The autumn 2026 update went through two full user acceptance cycles of 389 and 483 business scenarios, including users without administrator rights, with no regressions. Purchase approvals, shift assignments, non-conformances and acceptance acts follow two-person rules: the author cannot approve their own record. Order and request statuses change only through the defined actions, and the server checks every change.
See it on an order of your own
Half an hour on your own scenario: one order from plan to shipment, one serial number from the supplier certificate to the acceptance act. We will also show what it does not do.
Як це виглядає в системі
Реальні екрани Syntech Manufacturing на платформі Creatio: планування, склад, якість, зміни, OEE, Andon і маркування.

Виробниче планування
Діаграма Ганта за робочими центрами з залежностями, статусами, завантаженням і деталями кожної операції.

Історія руху запасів
Повний журнал приймання, видачі та внутрішніх переміщень із партією, кількістю, комірками, документом і відповідальним.

Контроль якості
Фінальна інспекція за критеріями: допустимі межі, фактичні значення, статуси вимірювань, коментарі та підсумковий результат.

Календар змін
Планування персоналу за робочими центрами: зміни, вихідні, відрядження та контроль покриття потрібної кількості працівників.

OEE та First Pass Yield
Доступність, продуктивність, якість, OEE і FPY по робочих центрах із порівнянням з цільовими показниками.

Andon-сигнал з робочого місця
Оператор повідомляє про нестачу матеріалів, проблему якості, поломку, інструмент або небезпеку безпосередньо з операції.

Маркування серійного виробу
Друк етикетки DataMatrix для серійного номера з шаблоном, попереднім переглядом та історією друку.

Маркування партії
Етикетка партії з кодом, кількістю, датою виготовлення, терміном придатності та штрихкодом Code 128.

Коміркове зберігання
Пошук складських комірок за зоною, товаром, партією або серійним номером із відображенням місткості та статусу.

Карта складських комірок
Візуальна карта зон і проходів зі статусами вільних, частково зайнятих, зайнятих та заблокованих комірок.

Налаштування Andon
Налаштування ролей сповіщення, строків ескалації та автоматичної зупинки операції після Andon-сигналу.

Конструктор шаблонів етикеток
Візуальне створення етикеток для партій і серійних виробів із плейсхолдерами, штрихкодами та попереднім переглядом.
See the System in Action
Detailed overview of Syntech Manufacturing capabilities on Creatio platform