Skip to content

    Everything it does, from demand to shipment

    Thirteen areas, 47 sections, one Creatio database. Below: what each does and where it sits in the flow from demand to a shipped unit.

    Talk to an engineer

    How it fits into one flow

    The flow starts with demand: a customer order, a contract delivery or a unit request becomes a ranked queue with promised dates, then a plan and production orders. An order takes the current revision's bill of materials and routing and becomes shift assignments and operations. The warehouse issues materials from bins, quality runs the checks, and the finished unit gets its batch, serial number and label. The contract and the export licence decide whether that batch may leave; traceability keeps the history. No hand-off here is an integration: one database, one product catalogue, one set of rights.

    Plan

    What to make, in what order, and by when.

    • Planning and MRPthe production plan with requirements exploded through the bills of materials and netted against stock and open supply. It creates orders and purchase requests.
    • Order queue and promised datesone ranked queue of sales orders, contract deliveries and unit requests. The ATP/CTP date comes from stock, capacity and lead times, with its reasons.
    • Engineeringbills of materials and routings under revision control with change notices, technological maps for the operator, CAD/PDM import, NATO codification.

    Make

    Who does the work, on what, and for how long.

    • Shop floorshift assignments, the operator workstation with scanning, andon signals with escalation, the work centre monitor, OEE and the shift fact.
    • Equipment and metrologyequipment passports, preventive maintenance by days or running hours, repair orders from andon, measuring instruments under calibration.
    • Peoplethe qualification matrix checked at operation start, staff reservation with quota and deadlines, time tracking, piece-rate and hourly pay.

    Control

    What you prove the unit with.

    • Qualityincoming, in-process and final inspection against the routing's criteria, non-conformances, CAPA, 8D, printed test protocols.
    • Traceability and recallssearch by batch or serial both ways, holds and recalls in one action, the electronic dossier as a PDF or an archive.
    • Contracts and military acceptancethe state contract with stages, delivery schedule and advances, acts signed by the military representative, the archive.
    • Export controllicences with quantity and value usage, end-user screening, end-use certificates, and the check before anything is issued.

    Run

    So material, paperwork and settings never hold production up.

    • Warehouse and binsbin storage with batches and serials, FEFO/FIFO, issues against an order, transfers, the bin map, labels.
    • Procurement and receivingpurchase requests from MRP and the shop floor, approvals by role, receiving with the supplier batch, certificate and incoming inspection.
    • Administration and mobilemanufacturing configuration, roles and approvers, background jobs and safeguards, the manufacturing log, mobile workplaces.

    What every area shares

    Three languages in every section

    English, Ukrainian and Russian: objects, fields, pages, lookups, settings, messages, mobile included.

    Role workplaces

    eight on the web and seven on mobile, each with a home page: planner, shift master, operator, storekeeper, quality inspector, buyer, HR officer, maintenance engineer.

    One Creatio database

    the same accounts, products, contracts and rights as in sales. Standard roles, audit logs, on-premise or private-cloud deployment, changes your administrators make.

    Start with the area that hurts

    Tell us which question costs most right now — late orders, traceability or acceptance — and we will build the demo around it, on your data.

    · ІНТЕРФЕЙС

    Як це виглядає в системі

    Реальні екрани Syntech Manufacturing на платформі Creatio: планування, склад, якість, зміни, OEE, Andon і маркування.

    Виробниче планування

    Виробниче планування

    Діаграма Ганта за робочими центрами з залежностями, статусами, завантаженням і деталями кожної операції.

    Історія руху запасів

    Історія руху запасів

    Повний журнал приймання, видачі та внутрішніх переміщень із партією, кількістю, комірками, документом і відповідальним.

    Контроль якості

    Контроль якості

    Фінальна інспекція за критеріями: допустимі межі, фактичні значення, статуси вимірювань, коментарі та підсумковий результат.

    Календар змін

    Календар змін

    Планування персоналу за робочими центрами: зміни, вихідні, відрядження та контроль покриття потрібної кількості працівників.

    OEE та First Pass Yield

    OEE та First Pass Yield

    Доступність, продуктивність, якість, OEE і FPY по робочих центрах із порівнянням з цільовими показниками.

    Andon-сигнал з робочого місця

    Andon-сигнал з робочого місця

    Оператор повідомляє про нестачу матеріалів, проблему якості, поломку, інструмент або небезпеку безпосередньо з операції.

    Маркування серійного виробу

    Маркування серійного виробу

    Друк етикетки DataMatrix для серійного номера з шаблоном, попереднім переглядом та історією друку.

    Маркування партії

    Маркування партії

    Етикетка партії з кодом, кількістю, датою виготовлення, терміном придатності та штрихкодом Code 128.

    Коміркове зберігання

    Коміркове зберігання

    Пошук складських комірок за зоною, товаром, партією або серійним номером із відображенням місткості та статусу.

    Карта складських комірок

    Карта складських комірок

    Візуальна карта зон і проходів зі статусами вільних, частково зайнятих, зайнятих та заблокованих комірок.

    Налаштування Andon

    Налаштування Andon

    Налаштування ролей сповіщення, строків ескалації та автоматичної зупинки операції після Andon-сигналу.

    Конструктор шаблонів етикеток

    Конструктор шаблонів етикеток

    Візуальне створення етикеток для партій і серійних виробів із плейсхолдерами, штрихкодами та попереднім переглядом.